68/ 100

Production Health

Monitoring

Based on last 5 tests

MonitoringImproving

Last 5 Pass Rate

80%

Last 10 Pass Rate

40%

Pass Rate Trend
Last 10 tests
May 12May 27May 27Jun 4Jun 4Sep 8Sep 9Sep 16Sep 16Sep 160%25%50%75%100%
Pass Marginal Fail 80% target

Monthly Breakdown

Tests

5

Pass Rate

0%

Failures

0

Sources

1

Sieve Performance Over Time (vs Spec Limits)
Material:
Sieve:
Timeframe:

Average gradation across last 3 testing days

75mm37.5mm25mm19mm9.5mm4.75mm2.36mm1.18mm0.6mm0.3mm0.075mmSieve Size0255075100% Passing
Actual
Spec Limits

QC Intelligence

Issue detection, trends, impact estimates, and operator actions.

QC Intelligence

3 active issues

Root Cause

Screen deck blinding or torn panel — material bypassing the screen at intermediate sizes.

Trend

Peak: 73%→Now: 73%

Operator Actions

1Inspect screen panels on middle deck (1.18mm separation)
2Look for blinded apertures, torn mesh, or pegged material
3Clean deck thoroughly and re-run a test before restarting

Root Cause

Gradual increase in fines — possible liner wear or increasing feed moisture.

Trend

Peak: 67%→Now: 67%

Operator Actions

1Monitor 2.36mm closely for next 2 tests
2Check liner thickness and crusher settings haven't changed
3Flag for supervisor review if drift continues next shift

Root Cause

Screen deck blinding or torn panel — material bypassing the screen at intermediate sizes.

Trend

Peak: 81%→Now: 81%

Operator Actions

1Inspect screen panels on middle deck (4.75mm, 2.36mm separation)
2Look for blinded apertures, torn mesh, or pegged material
3Clean deck thoroughly and re-run a test before restarting
Field Report

Operator-ready summary. Scannable in 30 seconds.

Sep 1, 2026 – Sep 28, 2026 · 0 belt tests

No belt sample data for this date range.