Scale Operator

Track shipments and compare production vs shipped tons

Sep 1, 2026 – Sep 21, 2026 · 70 records

Total Tonnes

6685.32t

Total Loads

336

Avg Load

19.9t

Avg Per Day

668.5t

Shipment Trend
Sep 1Sep 2Sep 3Sep 4Sep 8Sep 9Sep 10Sep 11Sep 14Sep 1503006009001200Avg 668.5t/day
Tons by Product
(1644)3"(75mm) City of Vernon Spec (1667)5mm Bedding Sand (1641)1"(25mm) City of Vernon Spec Schedule B(1608) 1" Drain Rock (1661) Septic Sand(1645) 6" Minus (150mm)(1621) 3"-6" Clear Fracture(1636) Wall Rock(1663) Hydro Sand(1623) 1" Clear Fracture(1634) CL 250 Rip Rap 11"-40" (270mm)(1622)1"-3" Clear Fracture(1630) CL 10 Rip Rap 3.5"-14" (90mm)2-4" Cobble(1609) 2" (50mm-25mm) Drain Rock(1611) 3"-6" Cobble (75mm-150mm)(1632) CL 50 Rip Rap 6"-24" (155m)0600120018002400
Product Mix

(1644)3"(75mm) City of Vernon Spec : 35% (2336.52t)

(1667)5mm Bedding Sand : 22% (1493.33t)

(1641)1"(25mm) City of Vernon Spec Schedule B: 22% (1449.48t)

(1608) 1" Drain Rock : 5% (317.76t)

(1661) Septic Sand: 3% (217.4t)

(1645) 6" Minus (150mm): 2% (165.29t)

(1621) 3"-6" Clear Fracture: 2% (137.07t)

(1636) Wall Rock: 2% (127.31t)

(1663) Hydro Sand: 2% (115.34t)

(1623) 1" Clear Fracture: 2% (107.92t)

(1634) CL 250 Rip Rap 11"-40" (270mm): 1% (91.82t)

(1622)1"-3" Clear Fracture: 1% (40.94t)

(1630) CL 10 Rip Rap 3.5"-14" (90mm): 0% (29.9t)

2-4" Cobble: 0% (27.84t)

(1609) 2" (50mm-25mm) Drain Rock: 0% (16.04t)

(1611) 3"-6" Cobble (75mm-150mm): 0% (8.03t)

(1632) CL 50 Rip Rap 6"-24" (155m): 0% (3.33t)

Daily Shipment Summary
DateProductTotal TonsTotal LoadsFirst EntryLast Entry
Sep 15, 2026(1667)5mm Bedding Sand 109.86t417:3317:33
Sep 15, 2026(1634) CL 250 Rip Rap 11"-40" (270mm)91.82t517:3317:33
Sep 15, 2026(1644)3"(75mm) City of Vernon Spec 36.58t317:3317:33
Sep 15, 2026(1632) CL 50 Rip Rap 6"-24" (155m)3.33t117:3317:33
Sep 15, 2026(1636) Wall Rock20.65t417:3317:33
Sep 15, 2026(1622)1"-3" Clear Fracture2.37t117:3317:33
Sep 15, 2026(1663) Hydro Sand35.13t117:3317:33
Sep 15, 2026(1608) 1" Drain Rock 26.71t117:3317:33
Sep 14, 2026(1661) Septic Sand107.62t417:3317:33
Sep 14, 2026(1641)1"(25mm) City of Vernon Spec Schedule B56.25t417:3317:33
Sep 14, 2026(1663) Hydro Sand11.35t117:3317:33
Sep 14, 2026(1608) 1" Drain Rock 27.16t117:3317:33
Sep 14, 2026(1644)3"(75mm) City of Vernon Spec 169.77t517:3317:33
Sep 14, 2026(1645) 6" Minus (150mm)17.69t317:3317:33
Sep 14, 2026(1667)5mm Bedding Sand 359.25t1117:3317:33
Sep 11, 2026(1661) Septic Sand80.2t317:3317:33
Sep 11, 2026(1644)3"(75mm) City of Vernon Spec 410.35t1717:3317:33
Sep 11, 2026(1608) 1" Drain Rock 86.96t417:3317:33
Sep 11, 2026(1609) 2" (50mm-25mm) Drain Rock11.92t117:3317:33
Sep 11, 2026(1641)1"(25mm) City of Vernon Spec Schedule B94.91t817:3317:33
Sep 11, 2026(1667)5mm Bedding Sand 36.66t317:3317:33
Sep 10, 2026(1641)1"(25mm) City of Vernon Spec Schedule B78.27t517:3317:33
Sep 10, 2026(1608) 1" Drain Rock 14.61t117:3317:33
Sep 10, 2026(1622)1"-3" Clear Fracture25.4t117:3317:33
Sep 10, 2026(1623) 1" Clear Fracture68.21t417:3317:33
Sep 10, 2026(1667)5mm Bedding Sand 263.99t817:3317:33
Sep 10, 2026(1644)3"(75mm) City of Vernon Spec 431.25t1617:3317:33
Sep 10, 2026(1621) 3"-6" Clear Fracture17.66t117:3317:33
Sep 10, 2026(1645) 6" Minus (150mm)110.7t417:3317:33
Sep 10, 2026(1636) Wall Rock4.16t117:3317:33
Sep 10, 20262-4" Cobble13.58t117:3317:33
Sep 9, 2026(1645) 6" Minus (150mm)17.49t317:3317:33
Sep 9, 2026(1623) 1" Clear Fracture39.71t317:3317:33
Sep 9, 2026(1644)3"(75mm) City of Vernon Spec 203.17t917:3317:33
Sep 9, 2026(1641)1"(25mm) City of Vernon Spec Schedule B87.96t517:3317:33
Sep 9, 2026(1636) Wall Rock1.81t117:3317:33
Sep 8, 2026(1641)1"(25mm) City of Vernon Spec Schedule B106.17t917:3317:33
Sep 8, 2026(1644)3"(75mm) City of Vernon Spec 525.63t3417:3317:33
Sep 8, 2026(1621) 3"-6" Clear Fracture24.3t117:3317:33
Sep 8, 2026(1645) 6" Minus (150mm)11.39t217:3317:33
Sep 8, 2026(1667)5mm Bedding Sand 313.6t1017:3317:33
Sep 8, 2026(1611) 3"-6" Cobble (75mm-150mm)8.03t117:3317:33
Sep 8, 2026(1608) 1" Drain Rock 4.45t117:3317:33
Sep 4, 2026(1621) 3"-6" Clear Fracture66.84t217:3317:33
Sep 4, 2026(1636) Wall Rock78.69t317:3317:33
Sep 4, 2026(1644)3"(75mm) City of Vernon Spec 44.16t317:3317:33
Sep 4, 2026(1663) Hydro Sand68.86t217:3317:33
Sep 4, 20262-4" Cobble14.26t117:3317:33
Sep 4, 2026(1609) 2" (50mm-25mm) Drain Rock4.12t117:3317:33
Sep 4, 2026(1667)5mm Bedding Sand 28.05t217:3317:33
Sep 3, 2026(1621) 3"-6" Clear Fracture4.15t117:3317:33
Sep 3, 2026(1608) 1" Drain Rock 28.15t117:3317:33
Sep 3, 2026(1630) CL 10 Rip Rap 3.5"-14" (90mm)29.9t217:3317:33
Sep 3, 2026(1667)5mm Bedding Sand 94.28t417:3317:33
Sep 3, 2026(1622)1"-3" Clear Fracture13.17t117:3317:33
Sep 3, 2026(1641)1"(25mm) City of Vernon Spec Schedule B327.76t1617:3317:33
Sep 3, 2026(1644)3"(75mm) City of Vernon Spec 97.9t417:3317:33
Sep 2, 2026(1608) 1" Drain Rock 19.08t117:3317:33
Sep 2, 2026(1621) 3"-6" Clear Fracture24.12t117:3317:33
Sep 2, 2026(1644)3"(75mm) City of Vernon Spec 311.48t1317:3317:33
Sep 2, 2026(1636) Wall Rock22t517:3317:33
Sep 2, 2026(1641)1"(25mm) City of Vernon Spec Schedule B379.7t2017:3317:33
Sep 2, 2026(1645) 6" Minus (150mm)2.77t117:3317:33
Sep 2, 2026(1667)5mm Bedding Sand 251.12t917:3317:33
Sep 1, 2026(1661) Septic Sand29.58t117:3317:33
Sep 1, 2026(1645) 6" Minus (150mm)5.25t117:3317:33
Sep 1, 2026(1644)3"(75mm) City of Vernon Spec 106.23t517:3317:33
Sep 1, 2026(1667)5mm Bedding Sand 36.52t217:3317:33
Sep 1, 2026(1641)1"(25mm) City of Vernon Spec Schedule B318.46t2417:3317:33
Sep 1, 2026(1608) 1" Drain Rock 110.64t417:3317:33
Aug 31, 2026(1644)3"(75mm) City of Vernon Spec 24.72t117:3217:32
Aug 31, 2026(1622)1"-3" Clear Fracture6.23t117:3217:32
Aug 31, 2026(1661) Septic Sand141.72t517:3317:33
Aug 31, 2026(1609) 2" (50mm-25mm) Drain Rock193.87t1117:3217:32
Aug 31, 2026(1641)1"(25mm) City of Vernon Spec Schedule B678.05t5417:3217:32
Aug 31, 2026(1634) CL 250 Rip Rap 11"-40" (270mm)252.05t1317:3217:32
Aug 31, 2026(1647)1"(25mm) Sand and gravel 11.54t117:3217:32
Aug 31, 2026(1623) 1" Clear Fracture9.98t117:3217:32
Aug 31, 2026(1667)5mm Bedding Sand 186.73t917:3317:33
Aug 28, 2026(1644)3"(75mm) City of Vernon Spec 74.08t317:3217:32
Aug 28, 2026(1641)1"(25mm) City of Vernon Spec Schedule B161.38t1317:3217:32
Aug 28, 2026(1609) 2" (50mm-25mm) Drain Rock14.45t117:3217:32
Aug 28, 2026(1661) Septic Sand112.05t417:3217:32
Aug 28, 2026(1608) 1" Drain Rock 55.97t217:3217:32
Aug 28, 2026(1667)5mm Bedding Sand 71.39t317:3217:32
Aug 27, 2026(1623) 1" Clear Fracture48.43t317:3217:32
Aug 27, 2026(1622)1"-3" Clear Fracture13.7t117:3217:32
Aug 27, 2026(1608) 1" Drain Rock 87.08t317:3217:32
Aug 27, 2026(1632) CL 50 Rip Rap 6"-24" (155m)1.21t117:3217:32
Aug 27, 2026(1644)3"(75mm) City of Vernon Spec 87.97t617:3217:32
Aug 27, 2026(1641)1"(25mm) City of Vernon Spec Schedule B521.87t4017:3217:32
Aug 27, 2026(1667)5mm Bedding Sand 194.84t717:3217:32
Aug 26, 2026(1623) 1" Clear Fracture146.06t917:3217:32
Aug 26, 2026(1609) 2" (50mm-25mm) Drain Rock27.97t117:3217:32
Aug 26, 2026(1661) Septic Sand111.94t417:3217:32
Aug 26, 2026(1631) CL 25 Rip Rap 5"-18"(125m)3.53t117:3217:32
Aug 26, 2026(1644)3"(75mm) City of Vernon Spec 79.27t317:3217:32
Aug 26, 2026(1641)1"(25mm) City of Vernon Spec Schedule B12.89t117:3217:32
Aug 26, 2026(1667)5mm Bedding Sand 54.45t317:3217:32
Aug 25, 2026(1623) 1" Clear Fracture65.55t517:3217:32
Aug 25, 2026(1609) 2" (50mm-25mm) Drain Rock12.23t117:3217:32
Aug 25, 2026(1645) 6" Minus (150mm)43t217:3217:32
Aug 25, 2026(1631) CL 25 Rip Rap 5"-18"(125m)5.64t117:3217:32
Aug 25, 2026(1667)5mm Bedding Sand 395.38t1317:3217:32
Aug 25, 2026(1636) Wall Rock39.3t317:3217:32
Aug 25, 2026(1644)3"(75mm) City of Vernon Spec 68.06t217:3217:32
Aug 25, 2026(1641)1"(25mm) City of Vernon Spec Schedule B27.52t217:3217:32
Aug 24, 2026(1641)1"(25mm) City of Vernon Spec Schedule B43.86t417:3217:32
Aug 24, 2026(1644)3"(75mm) City of Vernon Spec 132.09t617:3217:32
Aug 24, 2026(1667)5mm Bedding Sand 14.41t117:3217:32
Aug 21, 2026(1667)5mm Bedding Sand 54.71t417:3217:32
Aug 21, 2026(1632) CL 50 Rip Rap 6"-24" (155m)2.27t117:3217:32
Aug 21, 2026(1631) CL 25 Rip Rap 5"-18"(125m)13.77t117:3217:32
Aug 21, 2026(1623) 1" Clear Fracture28.03t217:3217:32
Aug 21, 2026(1641)1"(25mm) City of Vernon Spec Schedule B78.9t617:3217:32
Aug 21, 2026(1608) 1" Drain Rock 14.47t117:3217:32
Aug 21, 2026(1644)3"(75mm) City of Vernon Spec 17.69t117:3217:32
Aug 20, 2026(1622)1"-3" Clear Fracture6.72t117:3217:32
Aug 20, 2026(1608) 1" Drain Rock 82.3t617:3217:32
Aug 20, 2026(1644)3"(75mm) City of Vernon Spec 13.54t117:3217:32
Aug 20, 2026(1623) 1" Clear Fracture6.81t117:3217:32
Aug 20, 2026(1661) Septic Sand66.67t517:3217:32
Aug 20, 2026(1641)1"(25mm) City of Vernon Spec Schedule B64.51t517:3217:32
Aug 19, 2026(1644)3"(75mm) City of Vernon Spec 448.54t1717:3217:32
Aug 19, 2026(1641)1"(25mm) City of Vernon Spec Schedule B40.75t317:3217:32
Aug 19, 2026(1667)5mm Bedding Sand 27.28t217:3217:32
Aug 18, 2026(1641)1"(25mm) City of Vernon Spec Schedule B64.04t517:3217:32
Aug 18, 2026(1636) Wall Rock69.93t317:3217:32
Aug 18, 2026(1608) 1" Drain Rock 13.73t117:3217:32
Aug 18, 2026(1644)3"(75mm) City of Vernon Spec 185.05t617:3217:32
Aug 18, 2026(1663) Hydro Sand32.77t117:3217:32
Aug 18, 2026(1667)5mm Bedding Sand 32.61t317:3217:32
Aug 17, 2026(1622)1"-3" Clear Fracture27.3t217:3217:32
Aug 17, 2026(1667)5mm Bedding Sand 388.71t1517:3217:32
Aug 17, 2026(1608) 1" Drain Rock 18.87t117:3217:32
Aug 17, 2026(1636) Wall Rock12.2t117:3217:32
Aug 14, 2026(1644)3"(75mm) City of Vernon Spec 36.43t317:3217:32
Aug 14, 2026(1645) 6" Minus (150mm)212.45t817:3217:32
Aug 14, 2026(1641)1"(25mm) City of Vernon Spec Schedule B12.62t117:3217:32
Aug 14, 2026(1621) 3"-6" Clear Fracture13.35t117:3217:32
Aug 14, 2026(1609) 2" (50mm-25mm) Drain Rock14.95t317:3217:32
Aug 14, 2026(1608) 1" Drain Rock 19.17t117:3217:32
Aug 13, 2026(1644)3"(75mm) City of Vernon Spec 330.04t1517:3217:32
Aug 13, 2026(1667)5mm Bedding Sand 28.28t217:3217:32
Aug 13, 2026(1622)1"-3" Clear Fracture4.36t117:3217:32
Aug 13, 2026(1641)1"(25mm) City of Vernon Spec Schedule B111.63t617:3217:32
Aug 12, 2026(1644)3"(75mm) City of Vernon Spec 133.52t517:3217:32
Aug 12, 2026(1636) Wall Rock19.31t217:3117:31
Aug 12, 2026(1621) 3"-6" Clear Fracture25.16t117:3117:31
Aug 12, 2026(1641)1"(25mm) City of Vernon Spec Schedule B96.16t417:3117:31
Aug 11, 2026(1644)3"(75mm) City of Vernon Spec 33.03t117:3117:31
Aug 11, 2026(1667)5mm Bedding Sand 12.38t117:3117:31
Aug 11, 2026(1623) 1" Clear Fracture11.92t117:3117:31
Aug 11, 2026(1641)1"(25mm) City of Vernon Spec Schedule B50.61t417:3117:31
Jul 31, 2026(1644)3"(75mm) City of Vernon Spec 25.99t217:3117:31
Jul 31, 2026(1645) 6" Minus (150mm)25.94t217:3117:31
Jul 31, 2026(1641)1"(25mm) City of Vernon Spec Schedule B91.65t717:3117:31
Jul 31, 2026(1608) 1" Drain Rock 13.29t117:3117:31
Jul 30, 2026(1623) 1" Clear Fracture8.44t117:3117:31
Jul 30, 2026(1608) 1" Drain Rock 24.53t217:3017:30
Jul 30, 2026(1636) Wall Rock45.02t217:3117:31
Jul 30, 2026(1667)5mm Bedding Sand 42.58t317:3117:31
Jul 30, 2026(1641)1"(25mm) City of Vernon Spec Schedule B15.96t117:3117:31
Jul 30, 2026(1644)3"(75mm) City of Vernon Spec 232.13t1617:3117:31
Jul 29, 2026(1645) 6" Minus (150mm)11.89t117:3017:30
Jul 29, 2026(1644)3"(75mm) City of Vernon Spec 199.75t917:3017:30
Jul 29, 2026(1661) Septic Sand55.2t317:3017:30
Jul 29, 2026(1667)5mm Bedding Sand 149.02t617:3017:30
Jul 29, 2026(1609) 2" (50mm-25mm) Drain Rock10.22t117:3017:30
Jul 29, 2026(1641)1"(25mm) City of Vernon Spec Schedule B158.18t717:3017:30
Jul 29, 2026(1636) Wall Rock24.27t217:3017:30
Jul 28, 2026(1608) 1" Drain Rock 79.23t517:3017:30
Jul 28, 2026(1644)3"(75mm) City of Vernon Spec 169.39t617:3017:30
Jul 28, 2026(1667)5mm Bedding Sand 169.91t717:3017:30
Jul 28, 2026(1609) 2" (50mm-25mm) Drain Rock233.9t1317:3017:30
Jul 28, 2026(1634) CL 250 Rip Rap 11"-40" (270mm)350.07t2017:3017:30
Jul 28, 2026(1622)1"-3" Clear Fracture25.84t117:3017:30
Jul 28, 2026(1621) 3"-6" Clear Fracture16.59t217:3017:30
Jul 28, 2026(1636) Wall Rock11.32t117:3017:30
Jul 28, 2026(1641)1"(25mm) City of Vernon Spec Schedule B188.58t617:3017:30
Jul 27, 2026(1668) Cow Sand (3mm)28.24t317:3017:30
Jul 27, 2026(1667)5mm Bedding Sand 54.94t217:3017:30
Jul 27, 2026(1608) 1" Drain Rock 55.99t217:3017:30
Jul 27, 2026(1644)3"(75mm) City of Vernon Spec 236.17t1017:3017:30
Jul 27, 2026(1641)1"(25mm) City of Vernon Spec Schedule B60.31t517:3017:30
Jul 27, 2026(1609) 2" (50mm-25mm) Drain Rock26t217:3017:30
Jul 27, 2026(1634) CL 250 Rip Rap 11"-40" (270mm)625.76t3617:3017:30
Jul 27, 2026(1661) Septic Sand27.37t117:3017:30
Jul 27, 2026(1631) CL 25 Rip Rap 5"-18"(125m)88.37t517:3017:30
Jul 24, 2026(1634) CL 250 Rip Rap 11"-40" (270mm)411.92t2117:3017:30
Jul 24, 2026(1608) 1" Drain Rock 54.86t217:3017:30
Jul 24, 2026(1631) CL 25 Rip Rap 5"-18"(125m)336.89t1817:3017:30
Jul 24, 2026(1641)1"(25mm) City of Vernon Spec Schedule B70.85t617:3017:30
Jul 24, 2026(1644)3"(75mm) City of Vernon Spec 26.32t217:3017:30
Jul 24, 2026(1661) Septic Sand82.78t317:3017:30
Jul 24, 2026(1667)5mm Bedding Sand 27.85t117:3017:30
Jul 23, 2026(1641)1"(25mm) City of Vernon Spec Schedule B7.47t117:3017:30
Jul 23, 2026(1644)3"(75mm) City of Vernon Spec 325.32t1417:3017:30
Jul 23, 2026(1661) Septic Sand28.57t117:3017:30
Jul 23, 2026(1667)5mm Bedding Sand 118.73t517:3017:30